- Timing belt and all that comes along with doing that
- Replace subframe and control arms do to squeaking
- Swap out dogbone mount to stock OEM mount
- Tackle the power steering leak from the hoses coming off the pump
- Tackle coolant leak from housing to block
- Tackle fuel pump level to get a accurate fuel level reading
I am hoping to run the GTI at the Tail Of The Dragon by spring of next year. So below is my TOD To Do list.
- New rotors (slotted)
- New brake pads
- New tires (either match the fronts or four new ones)
- New stock OEM axles both sides (never can be too sure)
- Add rear swaybar
- Add front lower strut bar
- Add (maybe) new shock/spring combo (no more than 1.5 inch drop)
- New lug nuts with locking lug nuts
The last To Do list is to make the car pretty.
- Strip and paint rims
- Redo door card fabric
- Strip and texture paint mirrors
- Strip and paint valve cover
- Tint ?! (Still on the fence on doing this and spending the money)
That is all i got for now. Its definitely going to be interesting. Now I only have to find the time to do it all.
No comments:
Post a Comment